well wasn't able to get it done today but I will be able tomorrow I ran out of shielding gas and airgas was closed for the day already
list of what got done today
made a throttle cable bracket and installed my throttle cable, adjusted the stopper so the pedal stops when the carb is all the way open, very basic little bracket but it will get the job done has a stop to keep it from twisting
installed my fuel inlet fitting and fuel line
attached my brake lines for front and rear, need to bleed the system In the morning
mounted my slave cylinder and connected the line to it, mounted my clutch fluid resovoir and am now ready to install the master cylinder once I cut down the rod and weld it shorter, the bracket is already welded in behind the dash
got my floor dimmer switch, was silver so I painted the lower half black and dipped the button part in bedliner, matches the floor now. got it wired up and working, thanks for that idea!
mounted my clutch master cylinder bracket in the dash, 90% of the welding is done but I ran out of gas
exhaust is finished from the header to the muffler, didn't have a chance to cut my 180* bend into the pieces I need for my over axle pipe i am going toget after it in the morning, shouldn't have any problem getting it done.
im within a couple hours of work from being on the road, I went and picked up tags for my plates today and the last of the fluids I needed, messed with the trans drain plug and got it fixed enough to use a bolt head to screw it in so I can use it. should be done in the morning, if not I will be tomorrow after work. so ready to be on the road again!
_________________
Luvless
1980 Mikado-Sold.
1993 Lexus SC400 my Daily
2004 Yamaha WR250F my new love in life
2016 Toyota Camry my girls ride